logo

Contact Us +44 (0)20 7928 9000
You are here: Home » Case Studies » SCAS Bicester

SCAS Bicester

 

Profession
Public Service
Location
Bicester, UK
Time Scale
16 Weeks
Size
22,230 sq/ft
Staff
N/A
Value
£2,500,000

Scope of Work

  • Preliminaries - design & project management
  • Health & safety
  • Demolition and strip out
  • Flooring
  • Partitioning
  • Feature walls
  • Glazed partitioning
  • Decoration/ wall coverings
  • Specialist joinery
  • Bespoke timber doors/partitioning etc.
  • Lighting installation
  • Feature lighting
  • Electrical installation
  • New suspended ceilings
  • Suspended ceilings amendments
  • Feature ceilings
  • Air conditioning and ventilation amendments
  • IT and data cabling
  • CAT 5e, CAT 6 wiring
  • Voice and data installations
  • Comms room
  • Security/access control
  • Window treatments
  • Blinds
  • Signage
  • Breakout area
  • Kitchen/restaurant
  • Tea point
  • Boardroom
  • Meeting rooms
  • Reception area
  • Bespoke reception desk
  • Furniture
  • Flexible open plan furniture
  • Soft furnishing to breakout/reception area
  • Move management
  • Sprinklers
  • Fire detection


Featured

NHS showcases cutting edge workspace design - DBB Magazine - June 2009
Metro beat off fierce competition to win the high profile SCAS contract. The result is cutting edge workspace that is not only visually stunning, but highly functional, energy efficient and cost effective...

[read more]

Bicester Brightside - MIX Magazine - November 2009
One of the (many) great things about organising Mixolog, is that we purvey all manner of great people, projects and products. A perfect example of this is the recently short listed South Central Ambulance Service project where the NHS, with not an inconsiderable amount of assistance from Metro Design, has showcased cutting edge workspace design.

[read more]


Video

  

© 1998-2012 Metro Design. All Rights Reserved | Website Design by EOS Web Design