logo

Contact Us +44 (0)20 7928 9000
You are here: Home » Case Studies » Endurance

Endurance

 

Profession
Insurance
Location
Minister Court, London EC3
Time Scale
6 Weeks
Size
11,000 sq/ft
Staff
N/A
Value
£1,000,000

Scope of Work

110 workstations, 110 Aeron chairs, 3 executive offices, Meeting rooms, Bespoke furniture.

  • Preliminaries - design & project management
  • Health & safety
  • Demolition and strip out
  • Flooring
  • Feature cesamic flooring
  • Partitioning
  • Feature walls
  • Glazed partitioning
  • Operable walls
  • Decoration/ wall coverings
  • Specialist joinery
  • Bespoke timber doors/ partitioning/ etc.
  • Lighting installation
  • Feature lighting
  • Electrical installation
  • Plasterboard ceilings
  • Suspended ceilings
  • Air conditioning and ventilation
  • Audiovisual installation
  • FM 200 fire extinguishing system to comms room
  • Base build enhancements
  • Security/ access control
  • Blinds
  • Breakout area
  • Tea point
  • Boardroom
  • Meeting rooms
  • Executive areas
  • Bespoke reception desk
  • Plants/ floral arrangements

© 1998-2012 Metro Design. All Rights Reserved | Website Design by EOS Web Design