logo

Contact Us +44 (0)20 7928 9000
You are here: Home » Case Studies » Boeing

Boeing

 

Profession
Aviation
Location
London, SW1
Time Scale
8 Weeks
Size
10,000 sq/ft
Staff
N/A
Value
£800,000

Scope of Work

Design and fit out of new office. 11 offices, 20 seat boardroom, data wiring, UPS reception, kitchen, furniture, bomb blast film, security.

  • Preliminaries - design & project management
  • Flooring
  • Feature tile flooring
  • Partitioning
  • Feature walls - polished plaster
  • Curved feature walls
  • Specialist bespoke timber frame blazed partitions
  • Decoration/wall coverings
  • Specialist joinery
  • Bespoke timber doors/partitioning etc.
  • Lighting installation
  • Feature lighting
  • Electrical installation
  • Plasterboard ceilings
  • Feature ceilings
  • Air conditioning and ventilation amendments
  • Audiovisual installation
  • IT and data cabling
  • CAT 5e wiring
  • Installation of media wall
  • Voice and data installations
  • Comms room
  • Security/access control
  • Window treatments - bomb film
  • Blinds
  • Signage
  • Breakout area
  • Tea point
  • Boardroom
  • Reception area
  • Bespoke reception desk/marble backdrop
  • Specialist artwork services
  • Furniture
  • Flexible open plan furniture
  • Soft furnishing to breakout/ reception area
  • Move management
  • Planters/ floral arrangements

Featured

Sunday Times - October 2001
Metro wins the Boeing fit out contract and is mention in the Sunday Times.

[read more]


Reference


© 1998-2012 Metro Design. All Rights Reserved | Website Design by EOS Web Design